Interior doors
Painted, veneered, laminated, PVC coated or eco-veneer, with or without glass.
PROFDOORS door installation
We choose the installation method according to the door construction, wall material and the site’s readiness.
PROFDOORS / INSTALLATION
There is no identical installation for all doors. A classic interior door is installed at one stage of the renovation, a hidden aluminum frame at another, and an exterior entrance door requires special attention to the threshold, sealing and protection of the mounting seam.
PROFDOORS supplies and assembles doors of different designs, and also offers customized solutions in size, finish and opening method. When preparing installation, we take into account not only the dimensions of the canvas. The material and strength of the walls, the actual geometry of the opening, the future floor, the thickness of the finish, the weight of the door, the location of communications and operating conditions are important.
If the property is still under renovation, it is better to contact us in advance. For concealed, cassette, high and glass systems, the correct sequence of work is especially important.
Painted, veneered, laminated, PVC coated or eco-veneer, with or without glass.
For painting, with finished finishing, mirror, veneer, decorative panels and reversible opening.
Wall, cassette, Magic, Pocket, telescopic, folding and glass systems.
For apartments and private houses: metal, wood, composite and aluminum structures.
Aluminium-glass doors, partitions and customized interior solutions.
Fire-resistant, technical and X-ray protective door sets.
QUICK SELECTION
Select a category to see installation features, opening requirements and estimated cost. If you are not sure about the type of construction, send a photo of the opening and briefly describe the task. We'll show you where to start.
Select the appropriate door type
Interior doors
We install painted, veneered, laminated and glazed interior doors. We work with classic and modern collections, doors of increased height, moisture-resistant WPC structures and models made to individual sizes.
Quality results depend not only on the canvas. The box should be positioned vertically in two planes, the platbands should be neatly connected, and the gaps between the canvas and the box should remain uniform around the entire perimeter. Before final fastening, we check the opening, the position of the lock and the absence of contact of the door leaf with the floor.
Opening size
Width and height are measured at several points. The difference between the measurements shows how much the opening is deviated from the correct geometry.
Wall thickness
The width of the box, the need for additions and the method of connecting the platbands depend on it.
Finished floor
You need to know the final height of your tile, hardwood, vinyl or other flooring. This allows the bottom gap to be determined in advance.
Opening direction
Before ordering, it is necessary to agree on the left or right side, and also understand whether the door will interfere with furniture, switches and passage.
Wall condition
On a noticeably uneven wall, the platband may not fit completely. The possibility of correction is assessed before installation.
Standard interior doors are usually installed after major wet and dusty work has been completed, when the walls are painted or covered and the finished flooring has already been laid. The room must have normal humidity, and the materials must undergo the required drying period.
If the plinth is already installed, its connection to the platband must be agreed upon in advance. In most cases, it is more convenient to install the skirting board after the doors.
The glass sheet requires careful handling and precise adjustment. Before installation, we check the integrity of the glass, the weight of the canvas and the compliance of the hinges. It is often impossible or undesirable to trim a finished door with glass on site, so dimensions must be confirmed before ordering.
We protect the finished surface from impacts, construction dust and mounting compounds. When installing, it is important not to damage the edges, varnish, enamel or natural veneer. If finishing work is still ongoing at the site, the door should be stored in a dry room in accordance with the manufacturer's requirements.
WPC doors are suitable for rooms with high humidity, but the moisture resistance of the leaf does not eliminate the installation requirements. It is necessary to correctly connect the box to the wall, take into account the finished floor and use materials that are compatible with the specific system. For a bathroom or toilet, ventilation and bottom clearance are separately agreed upon.
Canvases of increased height require more precise preparation of the opening and checking the load-bearing capacity of the wall. Weight affects the choice of loops, the number of attachment points and the method of carrying. Such doors cannot be assessed only by width and height: the material of the door leaf, the design of the frame and the conditions of entry to the site are important.
Estimated price
The price depends on the configuration, the condition of the opening, the thickness of the wall, the number of trims and additions, the type of fittings and the need for additional work.
Possible if the elevation and thickness of the future coating are precisely known. However, for a standard interior door, it is safer to perform the final installation after the floor is ready.
Standard handle and lock installation can be included in the calculation. Complex fittings, electronic locks, hidden solutions and additional milling are calculated separately.
Sometimes you can replace only the canvas, but the dimensions, location of the hinges and lock must match. For most projects, the new box kit will give a more accurate and predictable result.
Small deviations are sometimes compensated for during installation. Significant differences require wall preparation or a separate solution for platbands and extensions.
The term depends on the design and condition of the opening. Several standard doors on a prepared site are usually installed sequentially in one or several working days. The exact time is indicated after inspection.
Indicate the number of doors and attach photographs of the openings. This will help prepare a more accurate preliminary calculation.
Sliding systems
The sliding door frees up space that would normally be occupied by a swing door. But smooth operation depends on the accuracy of the guide, the weight of the door, the geometry of the wall and the correctly selected fittings.
We install wall systems, hidden Magic mechanisms, Pocket cassette doors, telescopic and folding structures, as well as sliding systems for glass panels.
For calculation you need to know:
The canvas moves along the wall surface. Such a system requires a free plane without furniture, protruding switches and other obstacles. The base for the guide must support the weight of the door, and the guide itself must be installed strictly horizontally.
The wall system is easier to install in a finished interior than the cassette system, but the panel and mechanism remain fully or partially visible.
The hidden mechanism gives the impression that the door moves without an external guide. For proper operation, the geometry of the canvas, the evenness of the wall, the exact position of the lower guide element and free movement along the entire length are important.
The plinth, handle and decorative elements must not interfere with full opening. These details are agreed upon prior to ordering.
The canvas goes inside the wall. The cassette and guide are installed before the partition is finally sewn. There should be no pipes, electrical wiring, sockets or other communications in the pocket area unless they are provided for by the system design.
Before starting work, it is necessary to confirm the wall thickness and cassette size. After stitching, access to the mechanism is limited, so adjustments and checks are carried out before finishing.
Such designs use several canvases and more complex fittings. For them, the width of the clear passage, the sequence of movement of the valves and the accuracy of the guide are especially important. The cost is calculated after selecting a specific system and configuration.
The weight of glass and factory holes for fittings must match the mechanism. After tempering, glass cannot be arbitrarily cut or drilled on site. Therefore, the final measurement is carried out after the surfaces to which the system is attached are ready.
Estimated price
Telescopic, folding or glass system - individual calculation
The price depends on the number of panels, weight, length of the guide, wall design and composition of fittings.
This usually requires opening or rebuilding part of the septum. The possibility depends on the wall material and the availability of communications.
The standard sliding system has structural gaps and is usually inferior to a properly installed swing door in terms of tightness. If acoustic comfort is important, this must be taken into account when choosing a system.
Most often the reason is related to the tilt of the guide or incorrect adjustment of the hangers. The guide must be installed strictly level.
Not for all systems. But a lower guide element is usually necessary to prevent the blade from swaying. Its shape depends on the selected mechanism.
For a door that is completely recessed into a pocket, a conventional protruding handle may interfere with movement. Special recessed handles or solutions compatible with the system are used.
Glass structures
Aluminium-glass doors and partitions visually divide the space, maintaining light and a sense of volume. Such systems are manufactured for a specific opening, so the quality of the result is determined at the measurement stage.
We install swing and sliding doors, stationary partitions, structures with transoms and individual profile and glass combinations.
It is advisable to take the final dimensions after the floor, walls and ceiling are ready. We check the width and height at several points, plane deviations and the possibility of reliable fastening of the profile.
Prior to production, agree:
Most of the holes and cutouts for fittings are made before the glass is tempered. Finished tempered glass cannot be arbitrarily drilled or reduced on site. Therefore, the dimensions, position of the profiles and the composition of the fittings are confirmed before production.
Estimated price
Installation of partition - calculated according to the project
Preliminary calculation can be prepared according to the drawing and dimensions. The final parameters are confirmed after measuring the finished opening.
For final production it is desirable to have finished surfaces. If design begins earlier, it is necessary to provide accurate marks for the future floor, ceiling and wall decoration.
It is necessary to know the layout of pipes or cables and agree on acceptable attachment points. Drilling without such information is not permitted.
Large glass elements are carried and installed by the team. The number of specialists depends on the size, weight and access to the site.
A new element can be manufactured, but it must exactly match the system and the location of the fittings. Profile reusability is assessed separately.
Entrance doors to the apartment
The entrance door to the apartment should move freely, close confidently and evenly press against the seal. The result is influenced by the strength of the wall, the geometry of the opening, the position of the box, the adjustment of the hinges and the quality of filling the installation seam.
We install metal and other entrance door blocks from the PROFDOORS range. Before starting work, we check the possibility of dismantling the old door, the condition of the opening and working conditions in the common corridor.
Dismantling is calculated separately, since a wooden and welded metal box require different time and tools. Before starting work, we assess the risk of damage to the floor, walls and existing slopes.
It is not always possible to completely preserve old slopes. The size of the new box and the mounting method may require local modifications. We inform you about this before installation, when the condition of the opening can be assessed in advance.
Even a canvas with good acoustic characteristics will not give the expected result if the box is installed skewed, the seals are pressed unevenly or the mounting seam is filled incorrectly. The threshold, key area and slope finishing are also important.
Estimated price
We plan dismantling and installation as a sequential job. The exact time depends on the old box, the condition of the opening and the need for its correction.
Sometimes yes, but it is impossible to guarantee complete preservation of the finish before dismantling. The solution depends on the size of the old and new box.
Slope finishing is indicated as a separate item if required. The scope of work is agreed upon before installation.
Yes, if the door and the selected system are compatible. Power supply, cables and component locations must be agreed upon in advance.
External entrance doors
The external door is part of the building envelope. In addition to precise geometry and reliable fastening, the base under the threshold, protection from moisture, thermal insulation, external sealing and correct connection to the facade are important here.
We install metal, aluminum, wood and composite entrance doors for private homes. The installation method is determined by the design of a particular door block and the preparation of the opening.
The threshold transfers the load to the base and at the same time is located in the area of possible water ingress. The base must be level, strong and prepared for a specific system. Voids, loose alignment and improper sealing can lead to sill movement, blow-off or moisture ingress.
Mounting connection materials are selected taking into account the design of the door, wall and manufacturer's requirements. Foam filling itself does not replace external seam protection. The connection must be protected from moisture, ultraviolet radiation and mechanical damage in the prescribed manner.
Estimated price
Threshold preparation, waterproofing and complex junctions - individual calculation
Possibility depends on temperature, materials used and condition of the object. Foams, sealants and tapes have an operating temperature range that must be observed.
The cause may not only be related to the door. The humidity of the room, ventilation, surface temperature, insulation of the slopes and the design of the installation unit all influence. The situation needs to be assessed comprehensively.
Requirements depend on the design and finish of the door. Protection from direct precipitation and intense sun usually improves the operating conditions of the outdoor unit.
This is recorded in the offer. Door installation, facade work and decorative finishing can be carried out by different specialists.
Fire doors
Fire door operates as a single door unit. Not only the canvas is important, but also the frame, hinges, lock, seals, closer, fasteners and mounting connection materials.
We install wooden and steel fire doors from the PROFDOORS range. Before work, we check the markings, completeness, class of the door and the requirements of the manufacturer’s documentation.
Any modification must be compatible with the documentation and purpose of the specific door unit.
Estimated price
The exact cost depends on the door material, weight, wall structure, threshold, door closer, installation joint requirements and site conditions.
The mounting connection material is selected only according to the specific door documentation. There is no universal answer for all fire blocks.
Only if the fittings are compatible with the door block and are allowed by its documentation.
Arbitrary trimming can change the characteristics of the structure. Any acceptable processing must be confirmed by the manufacturer.
If it is provided by the design and configuration, the closer ensures that the door returns to the closed position. After installation, the complete closing cycle and latch operation are checked.
Technical solutions
The technical door can lead to a warehouse, utility room, boiler room, engineering area or commercial premises. Requirements for it are determined not only by size, but also by operating conditions: humidity, temperature, traffic intensity, need for ventilation and type of access control.
We install technical door blocks, metal service doors and special hidden doors for rooms with special requirements.
Electromechanical locks, readers, exit buttons, cable transitions and other elements must be approved prior to installation. Preparation of power supply and low-current wiring is carried out according to the project. Do not drill into the door block after installation without checking the permissible zones.
The X-ray protective door is part of the protective circuit of the room. Its parameters are determined by the project, including the required lead equivalent and the connection of the door block to the wall. This design is calculated individually and installed in accordance with the manufacturer’s documentation and the design requirements of the facility.
Estimated price
For special objects, the calculation is prepared after receiving the design and technical requirements.
This depends on the design and purpose of the door. For fire protection and special units, arbitrary modifications are not permitted.
Yes, if the equipment is compatible with the door and the connection conditions are agreed upon in advance.
Possible if the dimensions, wall strength and condition of the opening match the selected block. The decision is made after measurement.
PROFDOORS / INSTALLATION
We start with the actual conditions
During the measurement, the specialist checks the parameters that affect the choice of door and its installation. This helps to see possible additional work in advance and prepare a clear calculation.
Give access to the opening from both sides. If the door is at the design stage, prepare a floor plan, information about the future floor and wall composition. For an external door, information about the facade, insulation and threshold design is useful.
Travel outside of Riga is calculated taking into account the address and route. If one door requires several stages of installation, the number of visits is agreed upon in advance.
PROFDOORS / INSTALLATION
Indicate the type and number of doors, the address of the facility and the stage of repair. You can immediately attach photographs of the opening and a general plan of the room.
Checking whether there is enough information for a preliminary calculation. For a complex system, we offer measurements or request additional dimensions.
We determine the door design, frame, opening direction, fittings and additional work.
We separately indicate installation, removal, dismantling, preparation of the opening and other agreed upon positions.
The installation period is agreed upon after the door and object are ready. For hidden and cassette systems, we plan the sequence of visits in advance.
We protect the work area, check the kit, install the door and make the required adjustments.
Together with the client, we check the opening, closing, operation of locks, hinges, guides and seals.
PROFDOORS / INSTALLATION
The composition of the installation is different for each door. In the proposal we indicate which works are included and which will be required additionally.
All prices include VAT 21%. Items without the word “from” are fixed prices of the approved price list. The total cost of the remaining work depends on the design of the door, the condition of the opening, the material of the walls, equipment, address and the necessary additional work. The visit of a specialist is paid separately. The exact calculation is confirmed after receiving the initial data or taking measurements.
PROFDOORS / INSTALLATION
You can install a standard interior door on a prepared site yourself if you have experience, precise tools and manufacturer’s instructions. Before starting work, it is important to evaluate not only the width and height of the opening.
The box is tightened with fasteners
The profile or stand changes shape, the gap becomes uneven, the lock begins to work with force.
Too much expanding foam used
Geometry may change before complete drying. For doors, a suitable composition and temporary spacers are used, if they are provided for by the technology.
The future floor has not been taken into account
After laying the covering, the door touches the surface or the bottom gap is too large.
Opening direction reversed
Door conflicts with furniture, switch, wall or passage.
The guide is installed with a slope
The sliding panel moves independently in one direction.
The installation seam is left open
The material is destroyed by moisture, sun and mechanical stress.
PROFDOORS / INSTALLATION
A professional drawing is not needed for the first calculation. Submit information that is already known.
Photographs help prepare preliminary calculations, but do not replace final measurements for individual and technically complex structures.
FAQ
Brief answers about prices, timing, opening preparation and additional work.
The type of door, dimensions and weight, wall structure, condition of the opening, composition of fittings, number of stages, address of the object and additional work are taken into account. Therefore, the "from" price is used for preliminary guidance only.
Yes. The cost depends on the address, distance and number of visits required. For objects outside Riga, the calculation is carried out individually.
You can prepare a preliminary calculation based on photographs and dimensions. For hidden, external, glass and special doors, the final conditions are confirmed after measuring or checking the design documentation.
Dismantling is indicated as a separate item. Its cost depends on the material of the old box, the method of fastening and the ability to safely preserve the adjacent trim.
Pick-up is agreed in advance and is calculated separately. It is necessary to take into account the size, weight, floor and the possibility of access to the site.
A small correction may be included in the offer. Expansion, strengthening, masonry, wall restoration and complex finishing are calculated after inspection.
Yes. Access to the opening is needed from both sides. Furniture, fragile objects and access to the work area must be cleared in advance.
Assembling a door creates less dust than dismantling and changing the opening. We protect the work area to the agreed extent, but during dismantling and drilling it is impossible to completely eliminate dust.
Opportunity is assessed based on the design, configuration and condition of the product. Before confirming installation, it is necessary to check the door and obtain technical information from the manufacturer.
For standard doors, the plinth is usually more convenient to install after the trim. For hidden doors, the junction of the plinth with the frame is designed in advance.
Yes, if the box design and opening preparation are designed for such a solution. A regular box and a hidden aluminum system require different installation.
The master checks the movement of the blade, the uniformity of the gaps, the lock, hinges, the pressure of the seals or the operation of the guide. The client receives basic recommendations for operation and subsequent finishing work.
Yes, the possibility depends on the system and door condition. To contact us, it is advisable to send a short video that shows the problem.
Yes. A general installation plan is drawn up for apartments, houses and commercial properties. Different types of doors may require different stages of completion.
Installation calculation
Specify the door type, site address, and what is already known about the opening. You can attach photos. We will check the information, ask clarifying questions if necessary and prepare the next step: preliminary calculation or specialist visit.
If the matter is urgent, please call us or send us a WhatsApp message. To calculate a complex structure, it is more convenient to use a form and attach photographs.
NEXT STEP
Send the door model, dimensions and some photos. We will help you determine the appropriate work order and prepare an individual installation calculation.
Don't know which category to choose? Check "Not yet defined" and describe the task in your own words.