MENU
MENU
Cart

PROFDOORS door installation

Precise installation is part of a good door

We choose the installation method according to the door construction, wall material and the site’s readiness.

  • Accurate measurement
  • Installation of various systems
  • Clear calculation
Professional entrance door installation by PROFDOORS specialists

PROFDOORS / INSTALLATION

We install doors that we know from the inside

There is no identical installation for all doors. A classic interior door is installed at one stage of the renovation, a hidden aluminum frame at another, and an exterior entrance door requires special attention to the threshold, sealing and protection of the mounting seam.

PROFDOORS supplies and assembles doors of different designs, and also offers customized solutions in size, finish and opening method. When preparing installation, we take into account not only the dimensions of the canvas. The material and strength of the walls, the actual geometry of the opening, the future floor, the thickness of the finish, the weight of the door, the location of communications and operating conditions are important.

If the property is still under renovation, it is better to contact us in advance. For concealed, cassette, high and glass systems, the correct sequence of work is especially important.

Interior doors

Painted, veneered, laminated, PVC coated or eco-veneer, with or without glass.

Hidden doors

For painting, with finished finishing, mirror, veneer, decorative panels and reversible opening.

Sliding systems

Wall, cassette, Magic, Pocket, telescopic, folding and glass systems.

Entrance doors

For apartments and private houses: metal, wood, composite and aluminum structures.

Glass structures

Aluminium-glass doors, partitions and customized interior solutions.

Special doors

Fire-resistant, technical and X-ray protective door sets.

QUICK SELECTION

What type of door does your property need?

Select a category to see installation features, opening requirements and estimated cost. If you are not sure about the type of construction, send a photo of the opening and briefly describe the task. We'll show you where to start.

Select the appropriate door type

Interior doors

Neat geometry and even gaps

We install painted, veneered, laminated and glazed interior doors. We work with classic and modern collections, doors of increased height, moisture-resistant WPC structures and models made to individual sizes.

Quality results depend not only on the canvas. The box should be positioned vertically in two planes, the platbands should be neatly connected, and the gaps between the canvas and the box should remain uniform around the entire perimeter. Before final fastening, we check the opening, the position of the lock and the absence of contact of the door leaf with the floor.

What is included in standard installation

  • checking the door, frame and equipment;
  • control of the dimensions and condition of the opening;
  • assembly and installation of door frame;
  • fastening the box while maintaining the geometry;
  • hanging and adjusting the blade;
  • installation of a standard handle and lock, if provided by the order;
  • installation of platbands from accessible sides;
  • checking the opening, closing and operation of the latch;
  • basic cleaning of the work area after installation.

What we check before installing

Opening size
Width and height are measured at several points. The difference between the measurements shows how much the opening is deviated from the correct geometry.

Wall thickness
The width of the box, the need for additions and the method of connecting the platbands depend on it.

Finished floor
You need to know the final height of your tile, hardwood, vinyl or other flooring. This allows the bottom gap to be determined in advance.

Opening direction
Before ordering, it is necessary to agree on the left or right side, and also understand whether the door will interfere with furniture, switches and passage.

Wall condition
On a noticeably uneven wall, the platband may not fit completely. The possibility of correction is assessed before installation.

When to install interior doors

Standard interior doors are usually installed after major wet and dusty work has been completed, when the walls are painted or covered and the finished flooring has already been laid. The room must have normal humidity, and the materials must undergo the required drying period.

If the plinth is already installed, its connection to the platband must be agreed upon in advance. In most cases, it is more convenient to install the skirting board after the doors.

Doors with glass

The glass sheet requires careful handling and precise adjustment. Before installation, we check the integrity of the glass, the weight of the canvas and the compliance of the hinges. It is often impossible or undesirable to trim a finished door with glass on site, so dimensions must be confirmed before ordering.

Painted and veneered doors

We protect the finished surface from impacts, construction dust and mounting compounds. When installing, it is important not to damage the edges, varnish, enamel or natural veneer. If finishing work is still ongoing at the site, the door should be stored in a dry room in accordance with the manufacturer's requirements.

Moisture-resistant WPC doors

WPC doors are suitable for rooms with high humidity, but the moisture resistance of the leaf does not eliminate the installation requirements. It is necessary to correctly connect the box to the wall, take into account the finished floor and use materials that are compatible with the specific system. For a bathroom or toilet, ventilation and bottom clearance are separately agreed upon.

High and heavy doors

Canvases of increased height require more precise preparation of the opening and checking the load-bearing capacity of the wall. Weight affects the choice of loops, the number of attachment points and the method of carrying. Such doors cannot be assessed only by width and height: the material of the door leaf, the design of the frame and the conditions of entry to the site are important.

Estimated price

Standard interior doorfrom 110 €
WPC doorfrom 110 €
High or heavy doorfrom 140 €

The price depends on the configuration, the condition of the opening, the thickness of the wall, the number of trims and additions, the type of fittings and the need for additional work.

Can the door be installed before the floor is laid?

Possible if the elevation and thickness of the future coating are precisely known. However, for a standard interior door, it is safer to perform the final installation after the floor is ready.

Is the handle included in the installation?

Standard handle and lock installation can be included in the calculation. Complex fittings, electronic locks, hidden solutions and additional milling are calculated separately.

Is it possible to save the old box?

Sometimes you can replace only the canvas, but the dimensions, location of the hinges and lock must match. For most projects, the new box kit will give a more accurate and predictable result.

What to do if the walls are uneven?

Small deviations are sometimes compensated for during installation. Significant differences require wall preparation or a separate solution for platbands and extensions.

How long does installation take?

The term depends on the design and condition of the opening. Several standard doors on a prepared site are usually installed sequentially in one or several working days. The exact time is indicated after inspection.

Calculate the installation of an interior door

Indicate the number of doors and attach photographs of the openings. This will help prepare a more accurate preliminary calculation.

Hidden doors

Installation that begins before finishing

The hidden door becomes part of the wall. The aluminum frame is integrated into the opening, and after finishing only the canvas and a neat technological gap remain visible. The exact level of the floor, the plane of the walls and the correct sequence of construction work are especially important here.

We install hidden doors for painting, models with finished finishing, natural veneer, mirror, glass and decorative panels. We work with standard and non-standard sizes, high canvases, reversible opening and premium aluminum systems.

Why a hidden door requires early approval

An ordinary door frame covers the edge of the opening with a platband. The hidden system does not have such a reserve. Errors in wall plane, floor height or frame position will remain visible after finishing is completed.

Before ordering, please specify:

  • precise marking of the finished floor;
  • finished wall thickness with all finishing layers;
  • left or right opening;
  • direction “toward” or “away”;
  • future finishing of the canvas and wall;
  • location of baseboard or wall panels;
  • position of switches, sockets and hidden communications;
  • necessity of a closer, limiter or special lock.

How to install

1. Checking the opening and design
We check the dimensions, opening direction, system configuration and the mark of the future floor. We check whether the opening meets the technical requirements of the selected box.

2. Installation of an aluminum box
We assemble and level the box. We check the verticals, the top lintel, the diagonals and the position relative to the future plane of the wall.

3. Preparing the connection to the wall
We fix the box in the way provided by the system. The joint is prepared for subsequent finishing in such a way as to reduce the risk of cracks.

4. Finishing work
Builders carry out puttying, painting, decorative plaster, wallpaper or installation of panels. The working parts of the profile must remain protected and clean.

5. Hanging and adjusting the canvas
After completing the wet and dusty processes, we install the canvas, adjust hidden hinges, magnetic lock and uniformity of gaps.

Installation can be performed in two visits

For many hidden systems, it is logical to divide the work. During the first visit, the box is installed and its connection to the wall is agreed upon. After finishing is completed, the craftsmen return to install the canvas, fittings and final adjustments.

The number of visits depends on the readiness of the facility and the selected system. This is taken into account when calculating the cost and departure.

Paintable canvas

The phrase “paintable” means that the surface is prepared for further finishing, but does not always include all painting work. Before applying materials, it is necessary to follow the recommendations of the manufacturer of the canvas and the paint used.

If the door must completely merge with the wall, the texture, thickness of the coating and the transition of the material across the edges are agreed upon in advance. Not all types of decorative plaster, heavy panels or mirrors can be applied without checking the permissible load.

Hidden doors with mirror and panels

Mirror, glass, veneer, quartz and decorative panels increase the weight of the canvas. This affects hinges, adjustment and carrying conditions. Before production, it is necessary to confirm the thickness of the trim, the position of the handle, the opening direction and the safe radius of door movement.

Reversible opening

The reversible door opens in a direction different from the standard geometry of the system, and allows you to maintain a single plane of the leaves in the corridor. This option cannot be chosen based only on photographs. We need a floor plan, opening side and an understanding of the finished wall planes.

High hidden doors

The higher the blade, the more noticeable any deviation. The opening must be stable, the walls must be prepared, and the frame must be secured without deformation. We also check the possibility of carrying a long sheet through the stairs, elevator and passages of the facility.

Estimated price

Installation of a hidden doorfrom 110 €
High hidden doorfrom 140 €

Repeated departure for hanging and adjustment - calculated separately

The cost depends on the height and weight of the canvas, wall design, number of stages, door decoration, complexity of the wall assembly and location of the object.

When should I order a hidden door?

Before final finishing of the walls. At this point, the wall structure and finished floor level should be determined.

Is it possible to install the box after painting?

Technically, the individual systems allow different sequences, but the classic hidden box is integrated into the wall before finishing. Late installation often requires reworking of finished surfaces.

Do I need to lay the floor before installation?

Not always, but accurate marking of the finished floor is required. An error in height will affect the bottom gap and the position of the entire door unit.

Who does the putty around the box?

This is consistent in the calculation. The installation of the box and the finishing of the wall can be carried out by different specialists. It is important to determine the boundaries of the work in advance and convey to the finishers the requirements of the selected system.

Is it possible to leave the canvas on site during repairs?

The canvas should not be left for a long time in conditions of high humidity, dust and risk of mechanical damage. Storage conditions depend on the material and manufacturer's instructions.

Why can a door touch the frame after repair?

The cause may be a change in geometry, load from finishing materials, incorrect adjustment of the hinges or deformation of the fastening unit. Therefore, the final inspection is carried out after the main work has been completed.

Calculate the installation of a hidden door

Attach a plan, dimensions of the opening and photographs of the wall on both sides. If you know the floor design, please indicate it in the comments.

Sliding systems

Free movement without unnecessary opening space

The sliding door frees up space that would normally be occupied by a swing door. But smooth operation depends on the accuracy of the guide, the weight of the door, the geometry of the wall and the correctly selected fittings.

We install wall systems, hidden Magic mechanisms, Pocket cassette doors, telescopic and folding structures, as well as sliding systems for glass panels.

First the system is selected, then the opening is prepared

For calculation you need to know:

  • width and height of the finished passage;
  • blade material and weight;
  • wall structure;
  • free space next to the opening;
  • thickness of future finishing;
  • required clear aisle width;
  • arrangement of sockets, switches, baseboards and furniture;
  • necessity of a lock, retainer and Soft Close closers.

Wall sliding door

The canvas moves along the wall surface. Such a system requires a free plane without furniture, protruding switches and other obstacles. The base for the guide must support the weight of the door, and the guide itself must be installed strictly horizontally.

The wall system is easier to install in a finished interior than the cassette system, but the panel and mechanism remain fully or partially visible.

Hidden Magic System

The hidden mechanism gives the impression that the door moves without an external guide. For proper operation, the geometry of the canvas, the evenness of the wall, the exact position of the lower guide element and free movement along the entire length are important.

The plinth, handle and decorative elements must not interfere with full opening. These details are agreed upon prior to ordering.

Cassette door Pocket

The canvas goes inside the wall. The cassette and guide are installed before the partition is finally sewn. There should be no pipes, electrical wiring, sockets or other communications in the pocket area unless they are provided for by the system design.

Before starting work, it is necessary to confirm the wall thickness and cassette size. After stitching, access to the mechanism is limited, so adjustments and checks are carried out before finishing.

Telescopic and folding systems

Such designs use several canvases and more complex fittings. For them, the width of the clear passage, the sequence of movement of the valves and the accuracy of the guide are especially important. The cost is calculated after selecting a specific system and configuration.

Sliding glass doors

The weight of glass and factory holes for fittings must match the mechanism. After tempering, glass cannot be arbitrarily cut or drilled on site. Therefore, the final measurement is carried out after the surfaces to which the system is attached are ready.

How to install

  1. We check the dimensions, the wall and the complete set of the mechanism.
  2. Mark the position of the guide and fastening points.
  3. Installing the mechanism and elements of the stroke limitation.
  4. We hang or insert the canvas.
  5. Mounting the lower guide element.
  6. We adjust the vertical, height and smoothness of movement.
  7. Setting up Soft Close, stoppers and lock, if provided.
  8. Checking the full opening and closing cycle.

Estimated price

Wall sliding systemfrom 120 €
Magic systemfrom 120 €
Cassette system Pocketfrom 200 €

Telescopic, folding or glass system - individual calculation

The price depends on the number of panels, weight, length of the guide, wall design and composition of fittings.

Is it possible to install a cassette door into a finished wall?

This usually requires opening or rebuilding part of the septum. The possibility depends on the wall material and the availability of communications.

Will a sliding door provide the same sound insulation as a swing door?

The standard sliding system has structural gaps and is usually inferior to a properly installed swing door in terms of tightness. If acoustic comfort is important, this must be taken into account when choosing a system.

Why does the canvas move to the side on its own?

Most often the reason is related to the tilt of the guide or incorrect adjustment of the hangers. The guide must be installed strictly level.

Is a bottom rail needed?

Not for all systems. But a lower guide element is usually necessary to prevent the blade from swaying. Its shape depends on the selected mechanism.

Is it possible to install a regular handle?

For a door that is completely recessed into a pocket, a conventional protruding handle may interfere with movement. Special recessed handles or solutions compatible with the system are used.

Glass structures

Precise measurements for a lightweight and stable design

Aluminium-glass doors and partitions visually divide the space, maintaining light and a sense of volume. Such systems are manufactured for a specific opening, so the quality of the result is determined at the measurement stage.

We install swing and sliding doors, stationary partitions, structures with transoms and individual profile and glass combinations.

When to take final measurements

It is advisable to take the final dimensions after the floor, walls and ceiling are ready. We check the width and height at several points, plane deviations and the possibility of reliable fastening of the profile.

Prior to production, agree:

  • section configuration;
  • door opening direction;
  • aluminum profile color;
  • type and processing of glass;
  • arrangement of handles, hinges and locks;
  • height of transoms and horizontal divisions;
  • connection to the floor, walls and ceiling;
  • conditions for glass to be brought into the object.

Why glass cannot be adjusted like a regular sheet

Most of the holes and cutouts for fittings are made before the glass is tempered. Finished tempered glass cannot be arbitrarily drilled or reduced on site. Therefore, the dimensions, position of the profiles and the composition of the fittings are confirmed before production.

How to install

  1. We protect finished surfaces in the work area.
  2. We transfer the design markings to the floor, walls and ceiling.
  3. We install and align aluminum profiles.
  4. Checking the diagonals and position of the doorway.
  5. We install glass elements using suitable gaskets and fasteners.
  6. We install the door, hinges, handles and lock.
  7. We adjust the gaps and operation of the sash.
  8. We carry out the sealing and final cleaning required by the system.

What affects the cost

  • total structure area;
  • number of glass sections;
  • height and weight of elements;
  • glass type;
  • number of doors;
  • complexity of junctions;
  • availability of transoms, corners and non-standard connections;
  • floor, elevator and skidding conditions;
  • need to dismantle the existing partition.

Estimated price

Installation of aluminum-glass doorIndividual calculation

Installation of partition - calculated according to the project

Preliminary calculation can be prepared according to the drawing and dimensions. The final parameters are confirmed after measuring the finished opening.

Do repairs need to be completed before the measurement?

For final production it is desirable to have finished surfaces. If design begins earlier, it is necessary to provide accurate marks for the future floor, ceiling and wall decoration.

Is it possible to install a partition on a heated floor?

It is necessary to know the layout of pipes or cables and agree on acceptable attachment points. Drilling without such information is not permitted.

How many people are required for installation?

Large glass elements are carried and installed by the team. The number of specialists depends on the size, weight and access to the site.

Can the glass be replaced later?

A new element can be manufactured, but it must exactly match the system and the location of the fittings. Profile reusability is assessed separately.

Entrance doors to the apartment

Reliable fastening, precise clamping and neat connection

The entrance door to the apartment should move freely, close confidently and evenly press against the seal. The result is influenced by the strength of the wall, the geometry of the opening, the position of the box, the adjustment of the hinges and the quality of filling the installation seam.

We install metal and other entrance door blocks from the PROFDOORS range. Before starting work, we check the possibility of dismantling the old door, the condition of the opening and working conditions in the common corridor.

What we specify in advance

  • dimensions of the existing opening;
  • wall material and thickness;
  • old box type;
  • new door opening direction;
  • the width of the passage and the possibility of skidding the block;
  • condition of the floor and slopes;
  • presence of intercom, cables, alarm or electronic lock;
  • rules for noisy work in the house;
  • possibility of parking and removal of the dismantled door.

Dismantling the old door

Dismantling is calculated separately, since a wooden and welded metal box require different time and tools. Before starting work, we assess the risk of damage to the floor, walls and existing slopes.

It is not always possible to completely preserve old slopes. The size of the new box and the mounting method may require local modifications. We inform you about this before installation, when the condition of the opening can be assessed in advance.

How to install

  1. We protect the floor and surrounding area.
  2. We dismantle the old canvas and box, if this is included in the order.
  3. Cleaning and checking the opening.
  4. We check the new door, opening direction and complete set.
  5. We arrange the box vertically, horizontally and diagonally.
  6. We fix the block in the way provided for by the design of the door and wall.
  7. We hang the canvas and check the uniformity of the gaps.
  8. We adjust hinges, locks and seal pressure.
  9. Fill the installation seam with suitable materials.
  10. We check the door in several opening and closing cycles.

Sound insulation depends on the entire door block

Even a canvas with good acoustic characteristics will not give the expected result if the box is installed skewed, the seals are pressed unevenly or the mounting seam is filled incorrectly. The threshold, key area and slope finishing are also important.

Estimated price

Entrance door installation165 €
Cutting out a metal door frame + dismantling the door255 €
Recycling an old door30 €
Finishing the doorway and slopes120 €
How long will the apartment be without a door?

We plan dismantling and installation as a sequential job. The exact time depends on the old box, the condition of the opening and the need for its correction.

Is it possible to install a door without damaging the slopes?

Sometimes yes, but it is impossible to guarantee complete preservation of the finish before dismantling. The solution depends on the size of the old and new box.

Is slope restoration included?

Slope finishing is indicated as a separate item if required. The scope of work is agreed upon before installation.

Is it possible to immediately install an electronic lock?

Yes, if the door and the selected system are compatible. Power supply, cables and component locations must be agreed upon in advance.

External entrance doors

Installation taking into account water, air and temperature

The external door is part of the building envelope. In addition to precise geometry and reliable fastening, the base under the threshold, protection from moisture, thermal insulation, external sealing and correct connection to the facade are important here.

We install metal, aluminum, wood and composite entrance doors for private homes. The installation method is determined by the design of a particular door block and the preparation of the opening.

What should be known before installation

  • wall and façade composition;
  • size and geometry of the opening;
  • finished floor mark inside and outside;
  • base design under the threshold;
  • opening direction;
  • presence of a visor or other protection from precipitation;
  • arrangement of insulation and waterproofing;
  • planned finishing of slopes;
  • availability of cables for lock, bell or access control.

Special attention to the threshold

The threshold transfers the load to the base and at the same time is located in the area of possible water ingress. The base must be level, strong and prepared for a specific system. Voids, loose alignment and improper sealing can lead to sill movement, blow-off or moisture ingress.

Installation seam

Mounting connection materials are selected taking into account the design of the door, wall and manufacturer's requirements. Foam filling itself does not replace external seam protection. The connection must be protected from moisture, ultraviolet radiation and mechanical damage in the prescribed manner.

How to install

  1. Checking the dimensions, base and condition of the opening.
  2. We carry out a trial installation and check the position of the threshold.
  3. We prepare the base sealing provided by the system.
  4. Install and temporarily fix the door block.
  5. We set the box according to the level and diagonals.
  6. We carry out load-bearing fastenings without profile deformation.
  7. Checking the operation of the door leaf, hinges and locks.
  8. We provide thermal insulation and sealing of the installation connection.
  9. We adjust the pressure of the seals and the threshold.
  10. We will coordinate the subsequent finishing of internal and external slopes.

Estimated price

Installation of an external entrance doorfrom 165 €
Dismantling the old blockfrom 70 €

Threshold preparation, waterproofing and complex junctions - individual calculation

Is it possible to install an external door in winter?

Possibility depends on temperature, materials used and condition of the object. Foams, sealants and tapes have an operating temperature range that must be observed.

Why does condensation appear?

The cause may not only be related to the door. The humidity of the room, ventilation, surface temperature, insulation of the slopes and the design of the installation unit all influence. The situation needs to be assessed comprehensively.

Do you need a visor?

Requirements depend on the design and finish of the door. Protection from direct precipitation and intense sun usually improves the operating conditions of the outdoor unit.

Who does the external slopes?

This is recorded in the offer. Door installation, facade work and decorative finishing can be carried out by different specialists.

Fire doors

Installation in accordance with the specific door configuration

Fire door operates as a single door unit. Not only the canvas is important, but also the frame, hinges, lock, seals, closer, fasteners and mounting connection materials.

We install wooden and steel fire doors from the PROFDOORS range. Before work, we check the markings, completeness, class of the door and the requirements of the manufacturer’s documentation.

What cannot be changed arbitrarily

  • number and location of fasteners;
  • box type;
  • hinges, lock and closer;
  • fireproof and smokeproof seals;
  • installation joint filling materials;
  • permissible clearances;
  • canvas dimensions by unconfirmed trimming;
  • holes for additional fittings.

Any modification must be compatible with the documentation and purpose of the specific door unit.

How to install

  1. We check the door, frame, markings and delivery set.
  2. We evaluate the opening and wall structure.
  3. We check the opening direction and the position of the threshold.
  4. Install and align the box.
  5. We carry out fastenings according to the prescribed diagram.
  6. We install the canvas and compatible fittings.
  7. Fill the installation connection with the specified materials.
  8. We adjust the hinges, lock, door closer and seals.
  9. Checking the independent complete closing and fixation of the latch.
  10. We transfer the installed block without arbitrarily replacing its elements.

Estimated price

Fire door installationfrom 165 €

The exact cost depends on the door material, weight, wall structure, threshold, door closer, installation joint requirements and site conditions.

Can I use regular polyurethane foam?

The mounting connection material is selected only according to the specific door documentation. There is no universal answer for all fire blocks.

Can I install a different handle or lock?

Only if the fittings are compatible with the door block and are allowed by its documentation.

Is it possible to shorten the door on site?

Arbitrary trimming can change the characteristics of the structure. Any acceptable processing must be confirmed by the manufacturer.

Why do you need a closer?

If it is provided by the design and configuration, the closer ensures that the door returns to the closed position. After installation, the complete closing cycle and latch operation are checked.

Technical solutions

Installation taking into account the purpose of the room

The technical door can lead to a warehouse, utility room, boiler room, engineering area or commercial premises. Requirements for it are determined not only by size, but also by operating conditions: humidity, temperature, traffic intensity, need for ventilation and type of access control.

We install technical door blocks, metal service doors and special hidden doors for rooms with special requirements.

We will clarify before calculation

  • room assignment;
  • wall material;
  • dimensions and condition of the opening;
  • required opening direction;
  • presence of threshold;
  • need for closer;
  • type of lock and access system;
  • presence of ventilation grill;
  • requirements for humidity, fire resistance or sound insulation;
  • intensity of use.

Access control and additional fittings

Electromechanical locks, readers, exit buttons, cable transitions and other elements must be approved prior to installation. Preparation of power supply and low-current wiring is carried out according to the project. Do not drill into the door block after installation without checking the permissible zones.

X-ray protective doors

The X-ray protective door is part of the protective circuit of the room. Its parameters are determined by the project, including the required lead equivalent and the connection of the door block to the wall. This design is calculated individually and installed in accordance with the manufacturer’s documentation and the design requirements of the facility.

Estimated price

Installation of a technical doorfrom 120 €
Installation of a special X-ray protective doorfrom 200 €

For special objects, the calculation is prepared after receiving the design and technical requirements.

Can a ventilation grill be added after purchase?

This depends on the design and purpose of the door. For fire protection and special units, arbitrary modifications are not permitted.

Do you install door closers and access systems?

Yes, if the equipment is compatible with the door and the connection conditions are agreed upon in advance.

Is it possible to install a technical door into an existing opening without modification?

Possible if the dimensions, wall strength and condition of the opening match the selected block. The decision is made after measurement.

PROFDOORS / INSTALLATION

Measurement is more than width and height

We start with the actual conditions

During the measurement, the specialist checks the parameters that affect the choice of door and its installation. This helps to see possible additional work in advance and prepare a clear calculation.

What a specialist checks

  • width and height of the opening at several points;
  • diagonals and deviation from vertical;
  • wall thickness and material;
  • condition of the base and edges of the opening;
  • marking an existing or future floor;
  • available opening direction;
  • space for platbands, trims and plinths;
  • location of electrical and other communications;
  • possibility of sliding and lifting the door;
  • working and parking conditions at the site.

What to prepare for measurement

Give access to the opening from both sides. If the door is at the design stage, prepare a floor plan, information about the future floor and wall composition. For an external door, information about the facade, insulation and threshold design is useful.

Travel outside of Riga is calculated taking into account the address and route. If one door requires several stages of installation, the number of visits is agreed upon in advance.

PROFDOORS / INSTALLATION

From the first message to the final adjustment

You are describing the task

Indicate the type and number of doors, the address of the facility and the stage of repair. You can immediately attach photographs of the opening and a general plan of the room.

We are updating the initial data

Checking whether there is enough information for a preliminary calculation. For a complex system, we offer measurements or request additional dimensions.

We agree on the package

We determine the door design, frame, opening direction, fittings and additional work.

Preparing the calculation

We separately indicate installation, removal, dismantling, preparation of the opening and other agreed upon positions.

Setting a date

The installation period is agreed upon after the door and object are ready. For hidden and cassette systems, we plan the sequence of visits in advance.

Installing

We protect the work area, check the kit, install the door and make the required adjustments.

Checking the result

Together with the client, we check the opening, closing, operation of locks, hinges, guides and seals.

PROFDOORS / INSTALLATION

A clear scope of work before installation begins

The composition of the installation is different for each door. In the proposal we indicate which works are included and which will be required additionally.

Usually included in basic installation

  • check contents;
  • installation and fastening of the box or mounting system;
  • curtain hanging;
  • adjustment of hinges and gaps;
  • standard lock setting;
  • installation of coordinated standard fittings;
  • door operation check;
  • basic cleaning of the work area.

Can be calculated separately

  • departure and re-exit;
  • dismantling the old door;
  • removal of doors and construction waste;
  • expansion, reduction or strengthening of the opening;
  • slope restoration;
  • installation of extensions and non-standard platbands;
  • installation of complex or electronic fittings;
  • cable work;
  • lifting a large door without a lift;
  • works with large format glass;
  • additional construction seam materials;
  • immediate or staged installation;
  • work outside the standard work area.
Cutting out a metal door frame + dismantling the door255 €
Entrance door installation165 €
Raising the door to the 3rd floor25 €
Raising the door to the 6th floor30 €
Raising the door to the 9th floor45 €
Recycling an old door30 €
Measurement in Riga30 €
Finishing the doorway and slopes120 €
Travel outside of Rigafrom 50 €
Interior doorfrom 110 €
WPC doorfrom 110 €
High or heavy doorfrom 140 €
hidden doorfrom 110 €
Wall sliding systemfrom 120 €
Magic systemfrom 120 €
Cassette system Pocketfrom 200 €
Aluminum-glass doorIndividual calculation
External entrance doorfrom 165 €
Fire doorfrom 165 €
Technical doorfrom 120 €
X-ray protective doorfrom 200 €
Removing a standard interior doorfrom 20 €

All prices include VAT 21%. Items without the word “from” are fixed prices of the approved price list. The total cost of the remaining work depends on the design of the door, the condition of the opening, the material of the walls, equipment, address and the necessary additional work. The visit of a specialist is paid separately. The exact calculation is confirmed after receiving the initial data or taking measurements.

PROFDOORS / INSTALLATION

Check more than just the sizes

You can install a standard interior door on a prepared site yourself if you have experience, precise tools and manufacturer’s instructions. Before starting work, it is important to evaluate not only the width and height of the opening.

Minimum check before installation

  • the door corresponds to the opening and opening direction;
  • kit is not damaged and contains the necessary parts;
  • finished floor level known;
  • the opening is cleaned and has sufficient strength;
  • the box can be positioned vertically in two planes;
  • selected fastener suitable for wall material;
  • installation composition is compatible with the door system;
  • can be safely lifted and held;
  • after installation, access to the adjustment elements will remain;
  • wall trim will not interfere with trim, hinges or door movement.

Errors that do not appear immediately

The box is tightened with fasteners
The profile or stand changes shape, the gap becomes uneven, the lock begins to work with force.

Too much expanding foam used
Geometry may change before complete drying. For doors, a suitable composition and temporary spacers are used, if they are provided for by the technology.

The future floor has not been taken into account
After laying the covering, the door touches the surface or the bottom gap is too large.

Opening direction reversed
Door conflicts with furniture, switch, wall or passage.

The guide is installed with a slope
The sliding panel moves independently in one direction.

The installation seam is left open
The material is destroyed by moisture, sun and mechanical stress.

When is it better to stop and call a specialist

  • the opening is noticeably deviated from the level;
  • the wall is weak or has an unknown structure;
  • the door is tall, heavy or contains large glass;
  • installed hidden aluminum box;
  • the mechanism must go inside the wall;
  • the door is external and requires threshold sealing;
  • fireproof or special door;
  • need to change factory holes or configuration;
  • There are pipes, heated floors or electrical wiring running nearby.

PROFDOORS / INSTALLATION

Five minutes for initial data saves time for clarification

A professional drawing is not needed for the first calculation. Submit information that is already known.

It is advisable to specify

  1. Type or link to the selected door.
  2. Number of doors.
  3. Approximate width and height of each opening.
  4. Wall thickness.
  5. Stage of repair.
  6. Wall material, if known.
  7. Address or town.
  8. Required dismantling.
  9. Desired opening direction.
  10. Special conditions: high floor, no elevator, limited access or facility opening hours.

What photos are needed

  • general view of the opening on one side;
  • general view from the other side;
  • upper part of the opening;
  • threshold and floor;
  • existing door if dismantling is required;
  • space next to the opening for the sliding system;
  • outer and inner side of the wall for the entrance door.

Photographs help prepare preliminary calculations, but do not replace final measurements for individual and technically complex structures.

FAQ

Answers before work begins

Brief answers about prices, timing, opening preparation and additional work.

How is the installation price determined?

The type of door, dimensions and weight, wall structure, condition of the opening, composition of fittings, number of stages, address of the object and additional work are taken into account. Therefore, the "from" price is used for preliminary guidance only.

Is the visit of the master paid?

Yes. The cost depends on the address, distance and number of visits required. For objects outside Riga, the calculation is carried out individually.

Is it possible to get a price from a photo?

You can prepare a preliminary calculation based on photographs and dimensions. For hidden, external, glass and special doors, the final conditions are confirmed after measuring or checking the design documentation.

Is removal of the old door included?

Dismantling is indicated as a separate item. Its cost depends on the material of the old box, the method of fastening and the ability to safely preserve the adjacent trim.

Do you remove old doors?

Pick-up is agreed in advance and is calculated separately. It is necessary to take into account the size, weight, floor and the possibility of access to the site.

Who prepares the opening?

A small correction may be included in the offer. Expansion, strengthening, masonry, wall restoration and complex finishing are calculated after inspection.

Do I need to vacate the premises?

Yes. Access to the opening is needed from both sides. Furniture, fragile objects and access to the work area must be cleared in advance.

Will there be a lot of dust?

Assembling a door creates less dust than dismantling and changing the opening. We protect the work area to the agreed extent, but during dismantling and drilling it is impossible to completely eliminate dust.

Can I install a door purchased elsewhere?

Opportunity is assessed based on the design, configuration and condition of the product. Before confirming installation, it is necessary to check the door and obtain technical information from the manufacturer.

When to install the baseboard?

For standard doors, the plinth is usually more convenient to install after the trim. For hidden doors, the junction of the plinth with the frame is designed in advance.

Is it possible to install a door without trim?

Yes, if the box design and opening preparation are designed for such a solution. A regular box and a hidden aluminum system require different installation.

What happens after installation?

The master checks the movement of the blade, the uniformity of the gaps, the lock, hinges, the pressure of the seals or the operation of the guide. The client receives basic recommendations for operation and subsequent finishing work.

Is it possible to call a technician just for adjustments?

Yes, the possibility depends on the system and door condition. To contact us, it is advisable to send a short video that shows the problem.

Do you work with multiple doors on one site?

Yes. A general installation plan is drawn up for apartments, houses and commercial properties. Different types of doors may require different stages of completion.

Installation calculation

Tell us about your project

Specify the door type, site address, and what is already known about the opening. You can attach photos. We will check the information, ask clarifying questions if necessary and prepare the next step: preliminary calculation or specialist visit.

Salon PROFDOORS
Grenču iela 2E Rīga
Message us on WhatsApp

If the matter is urgent, please call us or send us a WhatsApp message. To calculate a complex structure, it is more convenient to use a form and attach photographs.

Get a preliminary estimate

Fill in known data. Fields with an asterisk are required. If there are no exact sizes yet, please provide approximate values or leave an explanation in the comments.

Submitting the form does not constitute confirmation of final cost or installation date.

NEXT STEP

Let's start with your door and the actual opening.

Send the door model, dimensions and some photos. We will help you determine the appropriate work order and prepare an individual installation calculation.

Calculate the projectCall PROFDOORS ↗

Don't know which category to choose? Check "Not yet defined" and describe the task in your own words.

Calculate installationGet an estimate
Chat with us on WhatsApp